REQUEST A QUOTE

about us services projects rates useful info Contact
Terms and conditions Privacy policy Cookie policy

Contact us

Send us a message using the form below and we will
contact you as soon as possible.

Thank you!

Your message has been sent successfully. A
member of our team will contact you
soon.

Construction rates

from

200EUR /sqm + VAT

Shell construction

from

600EUR /sqm + VAT

Turnkey construction

Complete Design Services for Durable Constructions

Complete Design Services for Durable Constructions

Building B+GF+4F - Eforie Nord

Building B+GF+4F - Eforie Nord

IPG Steel & Concrete had the pleasure of building a structure made 100% of reinforced concrete

IPG Steel & Concrete had the pleasure of building a structure made 100% of reinforced concrete

B+GF+3F+Attic - 2023

B+GF+3F+Attic - 2023

Buildings for tourist use - B+GF+2F - 2022

Buildings for tourist use - B+GF+2F - 2022

B+GF+2F - 2025 - Constanta

B+GF+2F - 2025 - Constanta

Bulk goods warehouse - Port of Constanta - Berth 44

Bulk goods warehouse - Port of Constanta - Berth 44

One-level overbuild

One-level overbuild

Single-family house GF+1F built in 2017

Single-family house GF+1F built in 2017

We develop the Romanian village

We develop the Romanian village

Holiday resort design

Holiday resort design

Collective housing building

Collective housing building

Beauty Express beauty salon

Beauty Express beauty salon

Facade restoration

Facade restoration

Execution of a single-family house in Cumpana

Execution of a single-family house in Cumpana

Apartment building design

Apartment building design

Design of a rental space building

Design of a rental space building

Guesthouse complex design

Guesthouse complex design

Design and execution

Design and execution

Implantology Clinic

Implantology Clinic

Broiler chicken growing hall

Broiler chicken growing hall

Useful information

Attic insulation

The attic has large heat losses because 1. it is positioned above buildings and 2. the roof is thinner compared to the exterior walls. Therefore, it requires professional insulation with high-quality materials, resistant to moisture, fire and able to provide both thermal and acoustic protection.

read more

The importance of the geotechnical study for a foundation

When you are planning the purchase of a plot of land or the start of a construction, one of the first stages is carrying out a Geotechnical Study, both to determine the nature of the foundation ground and the composition of its layers, and for the correct sizing of the foundations and the calculation of the structural elements.

read more

Which covering should we choose for the roof?

The covering of the house is an important choice that we must make together with the architect and the structural engineer, but at the same time we must take into account the aesthetics, the slope, the resistance structure or other criteria.

read more

Information about applying decorative plaster

Decorative plaster can withstand temperature fluctuations for many years, it can be washed or refreshed with washable paint. One of the main conditions is that it must be applied correctly, following the requirements mentioned by the manufacturer.

read more

Useful information

Attic insulation

The attic has large heat losses because 1. it is positioned above buildings and 2. the roof is thinner compared to the exterior walls. Therefore, it requires professional insulation with high-quality materials, resistant to moisture, fire and able to provide both thermal and acoustic protection.

read more

The importance of the geotechnical study for a foundation

When you are planning the purchase of a plot of land or the start of a construction, one of the first stages is carrying out a Geotechnical Study, both to determine the nature of the foundation ground and the composition of its layers, and for the correct sizing of the foundations and the calculation of the structural elements.

read more

Which covering should we choose for the roof?

The covering of the house is an important choice that we must make together with the architect and the structural engineer, but at the same time we must take into account the aesthetics, the slope, the resistance structure or other criteria.

read more

Information about applying decorative plaster

Decorative plaster can withstand temperature fluctuations for many years, it can be washed or refreshed with washable paint. One of the main conditions is that it must be applied correctly, following the requirements mentioned by the manufacturer.

read more